Camlı Yangın Kapısı - Acıbadem Maslak Hastanesi
Pentek - Ultra Slim Steel Profile System
dormakaba - Door Sequencer

MESS Technology Center, MEXT – Steel Framed Fire Rated Façade is completed.

Mess Technology Center, as "The world's largest digital conversion and competence development center" established by the Association of Metal Industries Technology Center was opened on August 29, 2020, in Istanbul.EI 90 class, steel-framed…

rp Fineline 70D Door

RP Technik introduced the slimmest steel door system with a thermal break “rp fineline 70D”.With one-piece glazed door, classical and modern glass lath alternatives, and different threshold options, rp fineline 70D offers the ideal solution…

BAU 2019 – Innovations

Slimmest steel profiles with thermal breakInnovations in the slender systems, heat-insulated steel profile system RP-ISO-FINELINE were introduced at BAU 2019 in Munich. In addition to the heat-insulated door, window, and partition…

RP Technik at BAU 2019

The world's leading architecture, building and construction materials fair, BAU, will be held in Munich, Germany between January 14-19, 2019.To discover the innovations in the RP-ISO-FINELINE steel joinery system with fine lines and our…

Turkey’s Longest Fire Rated Butt Joint Glass Wall

Turkey's largest (24-meter) fire-rated glass wall was constructed with the butt-joint technique in Acibadem Maslak Hospital.The lobby and waiting areas of the children's health and diseases department were aesthetically combined with a fire-resistant…